WA Planning Commission AS2885 Expert Advisor and SMS Arrow Energy Lynwood to Jordan Gas Pipeline HAZOP, LOPA & SMS
Arrow Energy Girrahween to Bellevue Gas Pipeline HAZOP, LOPA & SMS
Beach Energy Cooper Basin Facility Retrospective HAZOPsBeach Energy Well Testing Facility HAZOP Beach Energy Crude Fuel Blending Facility HAZOPBHP Water Security Project CHAZOP
APA Group Winchelsea Compressor Stn HAZOP
APA Group Kurri Kurri Compressor Stn HAZOPAPA Group CribPt Pakenham SMS & ALARP Review
Esso Australia 5 Yearly onshore Pipeline SMS (16 pipelines)
Nexif Energy Snapper Point Power Station, HAZOP & LOPA Assessment
LogiCamms/OSD/APA Dyson Rd HAZOP & SMSLogiCamms Santos Gobe PNG Decommissioning HAZOPLogiCamms MAPS Hazop
Client Name Withheld H2 Electrolyser and Compression HAZOP
Client Name Withheld CO2 Pipeline SMSJemena Tempe & Flemington SMSJemena Malabar Biofuels Project Risk Review
Jemena Western Sydney Green Gas (Hydrogen) Project Risk ReviewOSD APLNG Facility Upgrade SMSTarac Technologies Rectification Project HAZOPVic Planning Authority Shenstone Park PSP SMSVic Planning Authority Arden St Precinct SMSRCL (Developer)/APA Peck Rd SMSBeveridge Williams (Developer)/APA Aurora SMSId Land (Developer)/APA Williamstown Rd SMSPlanning Matters (Developer)/APA Wumbulgal SMSTaylors (Developer)/APA Mulcahy Rd SMSId Land (Developer)/Ausnet Banool Rd SMSBeveridge Williams (Developer)/APA Tivendale Rd SMSBeveridge Williams (Developer)/APA Ivory Drive SMS
Previous Clients & Experience
Clients Experience
GLNG SMS (Multiple) & RPEQ APLNG AS2885 SMS (Multiple)QCLNG AS2885 SMS & HAZOP (Multiple)Epic Energy HAZOP, SMS, Project Risk, Eng MgmtAPA Group Multiple SMS, Project Risk & HAZOP
Santos Sangu Offshore HAZOPLogiCamms PA TasGasPipeline Meter Stn HAZOP&Proj.DtrLogiCamms Epic Energy MAPS Hazop
Santos Mercury Removal Project HAZOP
ExxonMobil JUHI Pipeline Road Overpass Encroachment SMS
Jemena Hydrogen Project Risk ReviewJemena EGP & ACTewAGL 5yr SMS'sJemena Windsor SMS
Jemena Horsley Pk Meter Stn HAZOP, CHAZOP & SMS
Jemena Wilton Meter Stn HAZOP & SMS Tarac Technologies Fusel Oil Project HAZOPVic Planning Authority Windsor PSP SMSVic Planning Authority Plumpton & Kororoit PSP SMS
Vic Planning Authority Pakenham, Wollert, Cardinia SMS'sBHP Lime Dosing HAZOP
BHP Tail Leach Upgrade Project HAZOP, Client MgmtSEAGas Pipeline Design, Bolivar offtake SMS
Senex Snatcher Pipeline SMS & HAZOP
Canterbury City Council Birnie Ave SMS
Canterbury City Council Charles St SMS
AGL Newcastle Power Stn Gas lateral & Storage SMS
AGL BIPS Power Stn Gas Connection Risk Assessment
Level Crossing Removal Project Grange Rd Stn SMS
Level Crossing Removal Project Murrumbeen Stn SMS
SA Water Fire System Upgrade Project Risk Review
SA Water Lower Murray Water Pipeline upgrade HAZOP
SA Water Christies Beach WWTP HAZOP
SA Water Heathfield WWTP HAZOP
SA Water Glenelg WWTP HAZOP
SA Water Happy Valley Controls Upgrade CHAZOP
SA Water Anstey's Hill Controls Upgrade CHAZOP
Career Highlights
Expert Advice and Witness - West Australian Planning Commission (WAPC), Perth WA:Mark has provided independent expert advice to the WAPC in an encroachment dispute between a Developer and a Pipeline Licensee. Services included interviewing all parties and providing considered opinions on matters relating to the application of the Australian Pipeline Standard AS2885. As part of his independent role, Mark was later invited to lead the Safety Management Study associated with this project on behalf of the WAPC and State Administrative Tribunal.HAZOP Studies H2 Electrolyser and Compression Project (Client Name Withheld), Qld:Mark led a series of HAZOP's for various Electrolyser and Compression packages.
SMS Study New CO2 Pipeline Project ( Client Name Withheld), Vic:Mark led a FEED level SMS for a new CO2 pipeline.
SMS Study EGP 5 Yearly SMS Review (Esso Australia), Vic:Mark led the SMS activities and workshops for 16 onshore pipelines across eastern Victoria.
SMS Study EGP 5 Yearly SMS Review (Jemena), Vic/NSW:Mark led the SMS activities and workshop for the Jemena Eastern Gas Pipeline.
SMS Study Shenstone Pk SMS (VPA/APA), Vic
Mark led the SMS activities and workshop for this new suburban development.
HAZOP & SMS Dyson Rd Pipeline Replacement Project (APA), SA
Mark supported OSD with the new Dyson Rd Pipeline by providing HAZOP and SMS services.RPEQ Reviewer Gladstone LNG Project (GLNG), Queensland:Mark was engaged to undertake RPEQ review of the Process documents associated with the Main Pipeline and Narrows Crossing.
HAZOP & LOPA, Nexif Energy, Pelican Point Power Station Facility Project, SAHAZOP & LOPA facilitator for the Project.CHAZOP, Santos, Roma East Compression Facility Project, QLDCHAZOP facilitator for the workshop.Engineering Manager/ Project Risk Manager - Project 80 MAP North Haul Project (Epic Energy), SA:Mark was engaged as the Engineering Manager and to manage the project risk for this Project from concept through to delivery including development of a project wide risk register and regular reviews throughout the project to ensure actions were properly addressed and closed out.HAZOP & SMS - Project 80 MAP North Haul Project (Epic Energy), SA:Mark was the Engineering Manager who helped deliver the “Project 80” MAP North Haul Project as an EPC project for Epic Energy. His role also included design management.SMS Facilitator Australia Pacific LNG Project (APLNG), Queensland:Mark lead all SMS and pre-construction SMS Workshops for the Main Pipeline and Narrows Crossing applying the AS2885 Risk Assessment process for location and non-location specific threats and undertaken detailed risk assessment of the residual threats using the ALARP process to ensure the remaining risks are acceptable. Multiple workshops over a 5 year period.SMS Facilitator McDowell/CCC JV, QGC/BG, QCLNG Export Pipeline, Gas Gathering Pipeline and Narrows Crossing Pipeline, QLDChaired four separate HAZOPs for the Export Pipeline, Gas Gathering Header and Narrows Crossing including the various facilities. Led six separate SMSs and pre-construction SMSs for the Export Pipeline, Gas Gathering Header, Laterals and Narrows Crossing applying the AS2885 Risk Assessment process for location and non-location specific threats, and undertaken detailed risk assessment of the residual threats using the ALARP process to ensure the remaining risks are acceptable. Multiple workshops over a 3-4 year period.SMS Facilitator – APLNG Lateral and Facility Development (APLNG), Qld:Mark was engaged to facilitate the SMS workshop associated with a new pipeline lateral and associated gas regulating facility development as part of the wider APLNG Gas development in Qld.SMS Facilitator Gladstone LNG Project (GLNG), Queensland:Mark lead all SMS and pre-construction SMS Workshops for the Main Pipeline and Narrows Crossing applying the AS2885 Risk Assessment process for location and non-location specific threats, and undertaken detailed risk assessment of the residual threats using the ALARP process to ensure the remaining risks are acceptable. Multiple workshops over a 2-3 year period.Client/Portfolio Manager BHP Olympic Dam, Mark was KBR’s BHP Client Manager for a range of Projects being deliver by KBR at Olympic Dam between 2007-2009 including the $150M Tails Leach Upgrade Project (KBR was the EPCM) and Tails Pond 5 EPCM among other minor projects.Senior Process Engineer, SEAGas Pipeline Project, Mark was the senior process engineer on the design of the SEAGas Pipeline from Victoria to South Australia.Risk Review, H2GO Hydrogen Project, Jemena, NSW
Mark was asked to undertake a review of the Risk Management Plan and Risk Register for the H2GO Hydrogen Project for Jemena. The review of the Jemena Group Project Risk Mgmt Plan, the H2GO Project Risk Mgmt Plan and the Project Risk Register
SMS Study ACTewAGL 5 Yearly SMS Review (Jemena), Canberra:Mark led the SMS activities and workshop for the Jemena operated pipeline networks around Canberra and Nowra.SMS Facilitator – Monash Uni Berwick Development, Pipeline Encroachment (APA), Vic:Mark was engaged to facilitate the SMS workshop associated with a new/expanded development of the Monash Campus adjacent to the APA pipeline.SMS Study Horsley Park project (Jemena), NSW:Mark led the Detailed Design SMS & HAZOP for the Horsley Park Meter Station Project.SMS, Jemena, Wilton City Gate Station Upgrade Project, QLDMark led the Detailed Design SMS & HAZOP for the Wilton Meter Station Project.SMS Facilitator Senex, Snatcher to Charo Oil Pipeline SMS & HAZOPLed the SMS workshop for the 4km “flexpipe” oil flowline from Snatcher to Charo in the Cooper Basin applying the AS2885 Risk Assessment process for location and non-location specific threats and undertaken detailed risk assessment of the residual threats using the ALARP process to ensure the remaining risks are acceptable. Mark was HAZOP Study Leader.SMS Facilitator – Sunbury Sth Suburban Development, Pipeline Encroachment (APA), Vic:Mark was engaged to facilitate the SMS workshop associated with a new development adjacent to the APA pipeline.SMS Facilitator – Mulcahy Rd Suburban Development, Pipeline Encroachment (APA), Vic:Mark was engaged to facilitate the SMS workshop associated with a new development adjacent to the APA pipeline.SMS Facilitator – Birnie Ave High Rise Development, Pipeline Encroachment (VIVA/Caltex), NSW:Mark was engaged to facilitate the SMS workshop associated with a new high rise development adjacent to the pipelines.SMS Facilitator – Newcastle Power Station Gas Connection & Storage Project (AGL), NSW:Mark was engaged to facilitate the Concept stage SMS workshop associated with connection of a new gas supply and gas storage facility to a proposed new Power Station Facility.SMS Facilitator – Wumbulgal Industrial Development, Pipeline Encroachment (APA), Griffith NSW:Mark was engaged to facilitate the SMS workshop associated with a new Rail siding and storage facility development adjacent to the APA pipeline.SMS Facilitator – Normandy Rd High Rise Development, Pipeline Encroachment (APA), Vic:Mark was engaged to facilitate the SMS workshop associated with a new high rise development adjacent to the APA pipeline.SMS Facilitator – Banool Ave Townhouse Development, Pipeline Encroachment (AusNet), Vic:Mark was engaged to facilitate the SMS workshop associated with a new townhouse development adjacent to the AusNet pipeline.SMS Facilitator - Crib Pt to Pakenham Pipeline Project (APA), Victoria:Mark has been retained to facilitate the Detailed Design, Pre-Construction and Pre-Commissioning SMS workshop through the development of the pipeline project including LOPA and ALARP assessments in compliance with the AS2885.6-2018 Pipeline Risk Assessment process.SMS Facilitator – Shenstone Park Suburban Development, Pipeline Encroachment (APA), Vic:Mark was engaged to facilitate the SMS workshop associated with a new development adjacent to the APA pipeline.SMS Facilitator – Aurora Suburban Development, Pipeline Encroachment (APA), Vic:Mark was engaged to facilitate the SMS workshop associated with a new development adjacent to the APA pipeline.SMS Facilitator – Tivendale Rd Suburban Development, Pipeline Encroachment (APA), Vic:Mark was engaged to facilitate the SMS workshop associated with a new development adjacent to the APA pipeline.SMS Pipeline Encroachment (Vic Government), Victoria:Mark was engaged to lead multiple Pipeline Safety Management Studies by the Victorian Metropolitan Planning Authority for new housing precincts adjacent to existing APA high pressure gas pipelines. (Wollert, Pakenham, Kororoit, Sunbury, Cardinia etc..)SMS Study Level Crossing Removal Project, Caulfield to Dandenong, Murrumbeena Station, Melbourne, Vic:Mark led the SMS review for the installation of a new elevated rail station at Murrumbeena adjacent to a Multinet pipelineSMS Study Level Crossing Removal Project, Caulfield to Dandenong, Grange Rd Crossing, Melbourne, Vic:Mark led the SMS review for the installation of a new elevated rail station adjacent to an APA pipeline near Grange Rd, Melbourne, Vic.HAZOP Study Rectifier Upgrade Project, Tarac Technologies, Barossa Valley SA:Mark led the HAZOP Studies for the Design of a new pressurised Rectifier Column in an existing alcohol derivative plant.Senior Process Engineer, Santos Heytesbury Gas Plant EPC Project, Mark was KBR’s senior process engineer on the design of the Heytesbury Gas Plant in Victoria as part of the EPC delivery of the project for Santos.SMS Study Service Stn Development, Kororoit Ck Rd, Altona North (SHA/APA) Vic:Mark led the SMS review for the positioning of a new Service Station adjacent to an APA pipelineHAZOP Facilitator- Port Bonython Mercury Removal Project (Santos), SA:Mark facilitated the HAZOP for the Pt Bonython MRU Project for Santos. Project Risk Facilitator – BIPS Gas Pipeline Connection Project (AGL), SA:Mark was engaged to facilitate several project risk workshops associated with connection of a new gas supply line from the existing Torrens Island Facility to the new Barker Inlet Power Station (BIPS).SMS Pipeline Encroachment JUHI Pipeline Road Overpass Encroachment Victoria (VicRoads):Mark was engaged to lead the JUHI Pipeline Safety Management Study by the Vic Roads for a project expanding an overpass on the Tullamarine Freeway. Mark worked with both the Vic Roads and ExxonMobil representatives to address the risks associated with the project.Risk Facilitator APA Group, Brooklyn Compression Facilities Cooling Water Demo Project, VICDecommissioning Project Risk Assessment facilitator.HAZOP Study MAPS Angaston Offtake Project, Epic Energy, SA:Mark led the HAZOP Study for the Design of a new gas offtake connection.SMS & HAZOP Facilitator – Multiple Pipeline & Facility Projects (Beach Energy),SA:Mark was engaged to lead multiple Pipeline Safety Management Studies and HAZOPs for various pipeline developments in the Cooper Basin for Beach Energy. Mark also wrote the HAZOP and SMS Process Guidelines for Beach Energy.SMS Study Peck Rd Planning Development Project, Cardinia Council, Melbourne, Vic:Mark led the SMS review for the installation of a new Peck Rd Planning Development adjacent to an APA pipeline in Cardinia Shire Council, Melbourne, Vic.Project Risk Facilitator – Fire System Upgrade Project (SA Water), SA:Mark was engaged to facilitate the project risk workshop for the extensive upgrade of the fire systems at the Bolivar Wastewater Treatment Facility utilising the Clients company risk matrix to ensure the risks were properly assessed and mitigated to Client expectations.CHAZOP & HAZOP, Jemena, Wilton City Gate Station Upgrade Project, QLDCHAZOP facilitator & HAZOP for the 50% Design and 100% Design workshops.SMS Study Pakenham East PSP Development (Cardinia Council/APA), Vic:Mark led the SMS for the Pakenham East PSP Development encroachment on the existing APA and Origin Gas Pipelines.SMS Study NEGI project (Jemena), NSW:Mark led the preliminary SMS for the NEGI bid process.HAZOP Study Fusel Oil Plant, Tarac Technologies, Barossa Valley SA:Mark led the HAZOP Study for the Design of a new Fusel Oil Plant.HAZOP Study Lime Dosing Pilot Plant Project, BHP Billiton, Olympic Dam, SA:Mark led the HAZOP Study for the Design of a new Lime Dosing Pilot Plant. Mark was also Concept Study Manager for the Project.HAZOP Study TLR Project, BHP Billiton, Olympic Dam, SA:Mark led the HAZOP Study for the Design of the pumped tails liquor recycling/transfer system.HAZOP Leader CSG Wellhead Capacity Upgrade Project (Santos), Qld:Mark has been engaged to lead numerous HAZOP’s and Process Hazard Reviews associated with CSG wellhead facilities including both Santos standard skid designs and designs sourced from APLNG.HAZOP Facilitator Rio Tinto Iron Ore, Fuel Infrastructure Upgrade, , WAHAZOP Study Leader (including residual risk assessment) for the expansion of the fuel handling facilities at Parker Point and Cape Lambert terminals during the front-end engineering design (FEED) stage.HAZOP Facilitator SEAGas, Bolivar Gas Meter Station and Pipeline Lateral, Mark was HAZOP Study Leader and SMS Chair for the project.
Other Relevant ProjectsHAZOP Facilitator Santos, Jackson Moonie Pipeline Decommissioning Project, Santos,
HAZOP Facilitator Roma Town Gas Meter Station Project,HAZOP Facilitator Epic Energy, South Headland Meter Station Project, , VICHAZOP Facilitator Santos, DPCU Heater Installation, SA HAZOP Facilitator Epic Energy, QSN Compression Station 2 & 6 Project, VICHAZOP Facilitator APA Group, Wollert Compression Project, VICHAZOP Facilitator Beach Petroleum, Jackson Truck Loading Facility, QLDHAZOP Facilitator APA Group, Brooklyn Lara Pipeline Compression Facilities Project, VICHAZOP Facilitator SA Water, Lower Lakes Pump Station Irrigation Facilities, SAHAZOP Facilitator Origin Energy, Darling Downs & Quarantine Gas Turbine Facilities, SAHAZOP Facilitator BHP Olympic Dam, Underground Refuelling